St. Cloud Pro Concrete
Main entrance of Harmony High School in Harmony, Florida

Harmony, FL Concrete contractor

Concrete Contractor in Harmony FL

St. Cloud Pro Concrete is a concrete contractor for Harmony FL, the master-planned community on US 192 east of St. Cloud, pouring patios and lanai slabs, driveway widenings, pool decks and generator pads. Harmony is unincorporated, so Osceola County issues the permits, and its homeowners association reviews exterior changes first: written approval before work begins, with 30 to 45 days to allow.

30 to 45 days
Time to allow for Harmony HOA design review.
Osceola County
Issues permits in Harmony (unincorporated).
24 ft
County cap on residential driveway width.

Concrete contractor in Harmony FL: the community

Harmony was planned from 1996 and opened for residents around 2003, on US 192 between St. Cloud and Holopaw. Its community development district was set up by ordinance in March 2000 and its residential owners association in October 2002, and the community is certified green by the Florida Green Building Coalition.

For concrete work that history means two things: the homes are relatively new, so the job is usually adding to a builder's slab rather than replacing old concrete, and every exterior change runs through the association before the county.

Aerial view of a Florida neighborhood of single-story homes, several with screened pool enclosures
Screened pool enclosures behind several homes in a Florida neighborhood.

Design review comes before the permit

The Harmony homeowners association's design review page is plain about it: "All exterior changes, additions, and structural changes to your home need written approval from the Association before any work begins." The committee meets twice monthly, applications received by the second or fourth Monday are reviewed at the next meeting, and the association says to allow up to 30 to 45 days.

  • A site plan showing the new concrete against the house, lot lines and existing slab.
  • Size, finish and color (broom, stamped, coated), and any border.
  • For a generator pad: the unit, its clearances and any screening.
  • For a driveway widening: the new width at the street, which the county also caps at 24 feet.
  • Approval in hand before the county permit application and the pour date.

Common Harmony concrete jobs

Typical jobs and the rule that shapes each
JobWhat shapes it
Patio or lanai extensionHOA approval; 4 in termite inspection gap below the wall finish (FBC R318.7)
Driveway wideningHOA approval; county driveway permit; 24 ft cap (Osceola Code 22-50.6)
Generator padHOA approval of location and screening; Generac clearances (5 ft from windows and doors)
Pool deck or resurfacingHOA approval of color and finish; county permit for new pool work

Sources: Harmony HOA design review page; 2023 Florida Building Code, Residential, R318.7; Osceola County Code Sec. 22-50.6; Generac-built air-cooled generator installation guidelines.

Charley's passage in August 2004 included a brief tornado in Harmony along US 192, per the National Weather Service's survey, a reminder that a generator pad is worth planning before hurricane season. Patios are covered on the concrete patio page and widening on the driveway extension page.

New white two-story house with a broom-finished concrete driveway meeting the public sidewalk
A broom-finished driveway running out to the public sidewalk.
Get a Free Quote

Tell us the job and where it is. The quote is free.

Concrete Contractor in Harmony: Questions

Screened patio with a concrete floor, a ceiling fan and red-cushioned patio furniture looking out on a lawn
A concrete patio slab under a roof and screen, with cushioned seating.

Do I need HOA approval for a patio in Harmony?

Yes. Harmony's homeowners association says all exterior changes, additions and structural changes need written approval from the association before any work begins, and names patios, fences, sheds, paint colors and landscaping among them. The same goes for widening a driveway or placing a generator.

How long does Harmony's design review take?

The association's design review committee meets twice a month; applications received by the second or fourth Monday are reviewed at the next meeting, and it says to allow up to 30 to 45 days for approval.

How do you choose a concrete contractor?

Compare written quotes line by line: the square footage, the thickness and reinforcement (on the lot and at the apron in the right-of-way), whether tear-out and hauling are included, who pulls the permit, and how the joints and slope are laid out. For structural work such as a garage or addition slab, check the contractor's state license at myfloridalicense.com; for a small job you hope to keep under the state's $7,500 permit exemption, you'll need a copy of the contract or other proof of the work's value for the county's exemption form (Osceola's Owner Disclosure of Exempt Work). In Harmony, also ask who submits the HOA design review application.

Who issues building permits in Harmony, Florida?

Osceola County. Harmony is unincorporated, so concrete slabs with footers, sheds, screen enclosures and driveway permits go through the county Building Office in Kissimmee (407-742-0200), not the City of St. Cloud.

Working on a Harmony home?

Send the job, the address and where you are in HOA review. The quote is free.

Get a Free Quote